CIVIL TECHNOLOGY
GRADE 12 
AMENDED SCE PAST PAPERS AND MEMOS
MAY/JUNE 2018

REQUIREMENTS: 

  1. Drawing instruments
  2. A non-programmable calculator
  3. ANSWER BOOK 

INSTRUCTIONS AND INFORMATION 

  1. This question paper consists of SIX questions. 
  2. Answer ALL the questions. 
  3. Answer each question as a whole. Do NOT separate subsections of  questions. 
  4. Start the answer to EACH question on a NEW page. 
  5. Do NOT write in the margins of the ANSWER BOOK. 
  6. You may use sketches to illustrate your answers.
  7. Write ALL calculations and answers in the ANSWER BOOK or on the  attached ANSWER SHEETS. 
  8. Use the mark allocation as a guide to the length of your answers. 
  9. Make drawings and sketches in pencil, fully dimensioned and neatly finished  off with descriptive titles and notes to conform to the SANS/SABS Code of  Practice for Building Drawings.
  10. For the purpose of this question paper, the size of a brick should be taken as  220 mm x 110 mm x 75 mm.
  11. Use your own discretion where dimensions and/or details have been omitted. 
  12. Answer QUESTIONS 2.7, 3.5, 4.3, 5.2, 5.3, 6.1 and 6.2 on the attached  ANSWER SHEETS using drawing instruments, where necessary.
  13. Write your CENTRE NUMBER and EXAMINATION NUMBER on every  ANSWER SHEET and hand them in with your ANSWER BOOK, whether you  have used them or not.
  14. Drawings in the question paper are NOT to scale due to electronic transfer. 
  15. Google Images was used as the source for all photographs and pictures.

QUESTIONS 

QUESTION 1: CONSTRUCTION, SAFETY AND MATERIALS 
Start this question on a NEW page. 
1.1 Study FIGURE 1.1 below that shows a worker drilling on a construction site and answer the questions that follow. 
1.1 2018
FIGURE 1.1 
1.1.1 Describe the purpose of the hard hat. (1) 
1.1.2 Explain how the worker can protect himself from the dust caused  by the drill. (1) 
1.1.3 Describe the consequences if safety equipment is not used by the  worker whilst drilling. (1) 
1.2 FIGURE 1.2 below shows safety equipment used for personal protection. 
1.2 2018
FIGURE 1.2 
1.2.1 Identify the safety equipment. (1) 
1.2.2 Name ONE specific place/working area where this equipment will  be used. (1)
1.3 FIGURE 1.3 below shows the line diagram of a roof truss. 
1.3 2018
FIGURE 1.3 
1.3.1 Identify the type of roof truss. (1)
1.3.2 Identify parts A to C of the roof truss. (3) 
1.3.3 Motivate why the roof truss in FIGURE 1.3 cannot be covered with  grass (thatch). (1) 
1.3.4 Name ONE roof covering that can be used for the roof in  FIGURE 1.3 if battens (38 mm x 38 mm) are used to keep the roof  covering in place. (1) 
1.4 Explain the difference between DPC (damp proof course) and a DPM (damp  proof membrane) in terms of where it is used. (2) 
1.5 Differentiate between a standard clay brick and a queen closer by means of  TWO freehand two-dimensional drawings in good proportion. Draw the view  of the headers only. Label EACH drawing and write down the width and  height of each brick. (5) 
1.6 Corrosion of steel sections can be prevented by either painting or galvanising  them. Recommend ONE of the methods and explain why you recommend it. (1) 
1.7 Name any TWO preservatives that can be used to preserve timber. (1)
1.8 Draw a neat sketch of a tongue and groove board used for flooring. (3)
1.9 Describe the purpose of cement in concrete. (1)
1.10 Distinguish between mass concrete and reinforced concrete. (2) 
1.11 During the casting of fresh concrete many air bubbles that cause voids are  trapped in the concrete. Name TWO ways in which trapped air in concrete  can be removed. (1) 
1.12 Explain the difference between a slump test and a cube test in terms of the  purpose of each test. (2) 
1.13 Name the component used to close the gap/opening between two adjacent  gypsum ceiling boards. (1) [30] 

QUESTION 2: ADVANCED CONSTRUCTION AND EQUIPMENT 
Start this question on a NEW page. 
2.1 FIGURE 2.1 below is a sketch of a precast concrete pile driven into the  ground. 
2.1 2018
FIGURE 2.1 
2.1.1 Name parts A and C. (2)
2.1.2 What does symbol B indicate? (1)
2.1.3 What equipment is used to drive this type of pile into the ground? (1)
2.1.4 Under what conditions will a pile foundation be used? (2) 
2.2 Explain how you will use a transparent pipe level to transfer levels from one  point to another. The pipe is already filled with water. (2) 
2.3 You must lay tiles on a floor. Name any THREE tools that can be used to set  out the floor for the tiles. (3) 
2.4 FIGURE 2.4 below is a machine that is used in the building environment. 
2.4 2018
FIGURE 2.4 
2.4.1 Identify the tool in FIGURE 2.4. (1)
2.4.2 Identify part A. (1)
2.4.3 Describe the function of part B. (1) 
2.5 Arches are commonly used in the building industry. 
2.5.1 Name the timber construction that has to be constructed to support  the bricks of a semi-circular arch. (1) 
2.5.2 Name the brick that is in the middle of the semi-circular arch. (1) 
2.6 FIGURE 2.6 below shows a concrete beam with defects caused by forces  acting on them. Name the types of forces that are responsible for the defects  at A en B.  
2.6 2018
FIGURE 2.6 (2) 
2.7 FIGURE 2.7 on the ANSWER SHEET shows an incomplete sectional view of  a cavity wall.  
Use ANSWER SHEET 2.7 to complete the cavity wall by drawing the  following in good proportion: 

  • Six brick courses above the existing two courses  (2) 
  • Mortar between brickwork (1) 
  • Symbol for concrete in the cavity between the walls (1) 
  • Symbol for concrete in the foundation (1) 
  • The symbol for back filling on one side only (1) 
  • The damp proof between the walls and the cavity (2) 
  • The weep hole (1) 
  • One wall tie (1) 

2.8 A garage needs to be converted to a bachelor's flat. Due to limited time and  the cost of labour, brick walls are not considered. Name a type of light-weight  wall that can be used to divide the garage into rooms. (1)
2.9 Describe ONE disadvantage of the type of wall named in QUESTION 2.8. (1) 
2.10 FIGURE 2.10 below shows an incomplete sectional view of a reinforced  beam. 
2.10 2018
FIGURE 2.10 
2.10.1 Identify A and B. (2) 
2.10.2 Name ONE negative consequence if there is no reinforcement  in concrete. (1) 
2.10.3 State ONE function of stirrups. (1) 
2.11 FIGURE 2.11 below shows formwork for a round column. 
2.11 2018
FIGURE 2.11 
Identify A to E. (5) 
2.12 Rearrange the stages below in the correct order to erect the rib and block  floor. Write down only the letters (A–C) in the correct order in the ANSWER  BOOK. 

  1. Place reinforcing on top of hollow blocks. 
  2. Pack all the hollow blocks between the ribs. 
  3. Place ribs on supporting walls. (1) [40] 

QUESTION 3: CIVIL SERVICES 
Start this question on a NEW page. 
3.1 Choose a description from COLUMN B that matches an item in COLUMN A. Write only the letter (A–H) next to the question numbers (3.1.1 to 3.1.6) in the  ANSWER BOOK, e.g. 3.1.7 F. 

COLUMN A 

COLUMN B

3.1.1 Pressure reducing valve 
3.1.2 Vacuum breaker 
3.1.3 Hot-water outlet 
3.1.4 Cold-water inlet 
3.1.5 Safety valve 
3.1.6 Thermostat

  1. installed at a water closet at the  highest point of a site sewerage  system
  2. regulates the temperature of the  water in the geyser by switching the  element on and off at a pre-set  temperature
  3. prevents the geyser from bursting
  4. pipes mounted on the top part of  a high-pressure geyser
  5. installed before the geyser to regulate  the incoming water pressure from the  municipal mains
  6. pipes mounted on the bottom part of  a high-pressure geyser
  7. mounted above the top level of the  geyser on the hot- and cold-water  pipes to prevent a syphoning action in  the system
  8. component that physically heats the  water in an electric geyser (6 x 1) (6) 

3.2 Where would you install a water trap? (1)
3.3 Name ONE type of water trap that is used at a hand wash basin. (1)
3.4 Draw the following electrical symbols: 
3.4.1 Socket outlet (2)
3.4.2 Two-way switch (2)
3.4.3 Light wall mounted (2) 
3.5 On ANSWER SHEET 3.5 complete the drawing of a sectional view of a septic  tank and show the following on your drawing: 

  • External walls with plaster and holes 
  • Inner wall with hole and plaster 
  • Inlet pipe with T-junction 
  • Outlet pipe with T-junction 
  • Liquid level 
  • Concrete cover with manholes (11) 

3.6 In the absence of piped water from the municipality, name ONE other source  of fresh water that is suitable for human consumption. (1) 
3.7 Describe the main function of a storm-water system. (1) 
3.8 Coal is the primary energy source used in South Africa to generate electricity.  Name ONE other source from which electricity can be generated. (1) 
3.9 Describe ONE advantage of a solar geyser. (1) 
3.10 Describe ONE possible way in which a consumer could reduce electricity  consumption in a home. (1) [30]

QUESTION 4: QUANTITIES, MATERIALS AND JOINING 
Start this question on a NEW page. 
4.1 Various options are given as possible answers to the following questions.  Choose the answer and write only the letter (A–D) next to the question  numbers (4.1.1 to 4.1.5) in the ANSWER BOOK, e.g. 4.1.6 C. 
4.1.1 … are used to connect steel roof parts, steel columns and in situ  timber trusses. 

  1. Steel nails 
  2. Bolts and nuts 
  3. Dry-wall screws 
  4. Cavity anchor (1) 

4.1.2 A/An … is a type of nail used to attach ceiling boards to the  brandering. 

  1. wire nail 
  2. cut nail 
  3. clout nail 
  4. oval wire nail (1) 

4.1.3 … is used to join copper pipes. 

  1. Brazing rod
  2. Welding rod 
  3. Grease 
  4. Solder (1) 

4.1.4 … are used to join the members of a timber roof truss to one  another. 

  1. Gang nails/A connector plate  
  2. Clout nails 
  3. Rawl bolts 
  4. Screws (1) 

4.1.5 … can be used to join a roof truss to brickwork. 

  1. Bolt and nut  
  2. Sleeve anchor  
  3. Hoop iron 
  4. All the above-mentioned (1)

4.2 FIGURE 4.2 below shows the front view of a two-panel door. Study the  drawing and complete the incomplete cutting list below. Write only the answer  next to the question numbers (4.2.1 to 4.2.7) in the ANSWER BOOK. 
4.2 2018
FIGURE 4.2  (7) 

MEMBER 

QUANTITY 

UNIT 

LENGTH 

WIDTH 

THICKNESS 

MATERIAL

Stile 

mm 

4.2.1 

114 

44 

Saligna

Top rail 

4.2.2 

mm 

813 

114 

4.2.3 

Saligna

Lock rail 

mm 

4.2.4 

4.2.5 

44 

Saligna

Raised  

and  

fielded  

panel

mm 

768 

612 

4.2.6

Saligna

Bottom rail 

mm 

813 

4.2.7 

44 

Saligna

4.3 FIGURE 4.3 below shows the floor plan of a garage with a garage door, a  side door and a window. 
4.3 2018
FIGURE 4.3 
SPECIFICATIONS: 

  • The superstructure is a one-brick wall, 220 mm wide and 2 600 mm high.
  • The side door opening is 2 100 mm high x 900 mm wide. 
  • The garage door is 2 400 mm wide x 2 100 mm high. 
  • The window opening is 1 500 mm wide x 450 mm high. 

Use ANSWER SHEET 4.3 and calculate the total area of the walls for the  superstructure that needs to be built after deducting all the openings. (18) [30]  

QUESTION 5: APPLIED MECHANICS 
Start this question on a NEW page. 
5.1 FIGURE 5.1 shows a shaped lamina. All dimensions are in millimetres. Study the lamina and calculate the centroid of the lamina form A-A. 
HINT: Use the formulae on the FORMULA SHEET. 
5.1 2018
FIGURE 5.1 (9) 
5.2 ANSWER SHEET 5.2 shows a diagram of a cantilever frame. Use ANSWER  SHEET 5.2 to answer the following questions. 
5.2.1 Name DIAGRAM A. (1) 
5.2.2 On ANSWER SHEET 5.2, develop and draw a diagram to  determine graphically the nature of the forces in each member  (part) of the cantilever frame. Use scale 1 mm = 1 N. (6) 
5.2.3 Use the information in the diagrams and complete the table on  ANSWER SHEET 5.2. (3) 
5.3 FIGURE 5.3 shows the space diagram of a beam with a span of 8 metres with two point loads and a uniformly distributed load. Study the diagram and answer the questions that follow. 
5.3 2018
FIGURE 5.3 
5.3.1 Convert the uniformly distributed load to a point load and write  down the value of the converted point load. (1) 
5.3.2 Determine the distance of the converted uniformly distributed load  that is now a point load, from RR. (1) 
5.3.3 Determine the distance of the 4 N point load, from RL. (1) 
5.3.4 The value of the shear forces at A = 15 N, B = 7 N, D = -9 N,  D1 = -13 N and E = 0 N. Use the available information and draw  the shear force diagram on ANSWER SHEET 5.3. Use a scale of  2 mm = 1 N. (8) [30] 

QUESTION 6: GRAPHICS AND COMMUNICATION 
6.1 FIGURE 6.1 below illustrates a detailed sectional view of the foot of a king  post roof truss. Study the drawing and complete the table on ANSWER  SHEET 6.1. 
6.1 2018
FIGURE 6.1 
6.2 FIGURE 6.2 below shows the floor plan of a two-bedroom house. 
6.2 2018
FIGURE 6.2
6.2.1 Study FIGURE 6.2 and develop and draw, on ANSWER  SHEET 6.2, to scale 1 : 50, the SOUTH ELEVATION of the  building. Use the specifications below. 
(Use the assessment criteria on ANSWER SHEET 6.2 as a  guideline for your drawing). 
SPECIFICATIONS: 

  • The height between the natural ground level and the top level  of the floor slab is 300 mm. 
  • The height between the floor slab and the underside of the wall  plate is 2 600 mm. 
  • The roof is covered with galvanised roof sheeting with a  228 mm wide fascia board. 
  • Ridge capping is 100 mm high. 
  • Rainwater downpipes are 75 mm in diameter and 100 mm  square gutters are used. 
  • One rainwater downpipe must be placed on each side the of  the roof. 
  • The eaves overhang is 500 mm and the verge overhang is  300 mm. 
  • The door opening is 2 100 mm high and 900 mm wide. 
  • The door step is 150 mm high. 
  • The building has a gable roof with a pitch of 30°. 

The following must also be shown on the drawing: 

  • The method used to determine the roof height 
  • Windows sills ​

WINDOW SCHEDULE

Window 1(W1) 

Window 2(W2)

 HFGAHDHS

Width 

Height 

Width 

Height

1 500 mm 

1 200 mm 

900 mm 

600 mm

THREE marks will be allocated for the application of scale.  
Start your drawing from corner A as indicated on ANSWER SHEET 6.2. (25) [40] 

TOTAL: 200

CENTRE NUMBER: 

                                                                              

EXAMINATION NUMBER:

                                                                                                                                 

ANSWER SHEET 2.7 
2.7 2018

FIGURE 2.7 

ASSESSMENT CRITERIA 

MARK 

CANDIDATE'S  MARK

Six brick courses above the two existing  courses

2

 

Mortar between brickwork 

1

 

Symbol for concrete in the cavity  between the walls 

1

 

Symbol for concrete in the foundation 

1

 

The symbol for back filling on one  side only 

1

 

The damp-proof course between the  walls and the cavity 

2

 

The weep hole 

1

 

One wall tie 

1

 

TOTAL: 

10

 

CENTRE NUMBER: 

                                                                               

EXAMINATION NUMBER:

                                                                                                                                 

ANSWER SHEET 3.5
3.5 2018

ASSESSMENT CRITERIA 

MARK 

CANDIDATE'S  MARK

External walls with plaster and holes 

3

 

Inner wall with hole and plaster 

2

 

Inlet pipe with T-junction 

2

 

Outlet pipe with T-junction 

2

 

Liquid level 

1

 

Concrete cover with manholes 

1

 

TOTAL: 

11

 

CENTRE NUMBER: 

                                                                               

EXAMINATION NUMBER:

                                                                                                                                 

ANSWER SHEET 4.3 
Complete your answers in the spaces indicated with ... and .... .

D

     

Centre line: Superstructure

     

2 / … = …

     

2 / … = …

     

Total = …

     

Minus 4 / … = …

     

= …

       
       

1/ 

… 

 

Area of walls for superstructure:

 

… 

 
       

1/ 

… 

 

Area of side door:

 

… 

 
       

1/ 

… 

 

Area of garage door:

 

… 

 
       

1/ 

… 

 

Area of window:

 

… 

 
       
     

Total area of wall after deductions:

     

= … … … …

     

= …

       
     

(18) 

CENTRE NUMBER: 

                                                                               

EXAMINATION NUMBER:

                                                                                                                                 

ANSWER SHEET 5.2 
5.2 A 2018(1) 

5.2 B 2018(6) 
DIAGRAM A IS NOT ACCORDING TO SCALE 

MEMBER 

NATURE

AE

 

BD

 

CD 

STRUT

DE

 

Tolerance of 1 N on both sides  (3) 

CENTRE NUMBER: 

                                                                               

EXAMINATION NUMBER:

                                                                                                                                 

ANSWER SHEET 5.3 
5.3 2018 AS

ASSESSMENT CRITERIA 

MARKS 

CANDIDATE'S MARK

Correct shape of shear force diagram 

1

 

Value of shear forces correctly measured 

5

 

Horizontal lines indicated 

2

 

TOTAL 

8

 

CENTRE NUMBER: 

                                                                               

EXAMINATION NUMBER:

                                                                                                                                 

ANSWER SHEET 6.1

NO. 

QUESTIONS 

ANSWERS 

MARKS

1. 

Identify the type of eave construction  used in the drawing. 

 

1

2. 

State the minimum pitch (slope) of  number 1, if galvanised roof sheeting  is used. 

 

1

3. 

Identify number 2. 

 

1

4. 

State the standard dimension of  number 3. 

 

1

5. 

State the purpose of number 4. 

 

1

6. 

Name the timber that is shown on top  of the external wall marked number 5. 

 

1

7. 

Draw the drawing symbol for  

number 6 in the next column. 

 

2

8. 

Explain the purpose of number 7. 

 

1

9. 

Name ONE material that can be used  for number 8. 

 

1

10. 

Identify number 9. 

 

1

11. 

Identify number 10. 

 

1

12. 

Draw a neat freehand line diagram of  a fink or a W roof truss in the next  column. 

 

3

   

TOTAL: 

15

CENTRE NUMBER: 

                                                                                                                                              

EXAMINATION NUMBER:

                         

ANSWER SHEET 6.2 A
A 2018

ASSESMENT CRITERIA

MARKS

CANDIDATES MARK

External walls

2

 

NGL(correctly  

drawn)

1

 

FFL(correctly  

drawn)

1

 

Window

1

 

Window sill

1

 

Door opening

1

 

Step

1

 

Fascia board

1

 

Rainwater 

downpipe

1

 

Roof (correctly  

drawn)

2

 

Gutter

1

 

Ridge capping

1

 

Determining roof  height

4

 

Any FOUR labels

4

 

Application of  scale 

One or two 

incorrect = 3 Three or four  

incorrect = 2 More than five 

incorrect = 1 No measurement correct = 0

3

 

TOTAL 

25

 

FORMULA SHEET 
IMPORTANT ABBREVIATIONS 

SYMBOL 

DESCRIPTION 

SYMBOL 

DESCRIPTION 

SYMBOL 

DESCRIPTION

Centroid 

Breadth/Width 

Radius

ℓ 

Length 

Side 

Area

FORMULAE

AREA OF   FORMULA
(in words)  
FORMULA
(in symbols)  
FORMULA FOR THE POSITION OF CENTROIDS  
 X-axis  Y-axis
Square   side x side  s x s
2

2
Rectangle   length x breadth  ℓ x b  ℓ 
2

2
Right-angled triangle   ½ x base x height  ½b x h
3

3
Equilateral triangle/ Isosceles triangle ½ x base x height ½b x h
2

3

Position of centroid = (A1 x d) ± (A2 x d)
                                        Total area
OR
Y = ΣAy 
       ΣA
OR
X = ΣAx 
        ΣA

Last modified on Thursday, 26 August 2021 11:40