INSTRUCTIONS FOR THE MARKERS
QUESTION 1: SAFETY AND MATERIALS (GENERIC)
1.1 Answer the following question regarding scaffolding.
1.1.1
1.1.2 228 mm (1) x 38 mm (1) (2)
1.1.3 Provides stability to the scaffolding. (1)
1.1.4 Minimum = 900 mm (1) and maximum = 1 000 mm (1) (2)
1.2
1.2.1 Placing of building rubble:
1.2.2 When materials are transported to higher surfaces:
1.3 Any THREE:
1.4 Rungs (1)
1.5 The coating of a metal by electrolysis (1) with a thin layer of another metal. (1) (2)
1.6 To improve the metal’s corrosion resistance. (1)
1.7 Any TWO:
[20]
QUESTION 2: GRAPHICS, JOINING AND EQUIPMENT (GENERIC)
2.1 FIGURE 2.1 on ANSWER SHEET A shows a floorplan of a storeroom on scale 1 : 50. Draw the south elevation on scale 1 : 50 on ANSWER SHEET A from the given ground level, by using the following information:
Use the marks table on ANSWER SHEET A as reference. (29)
2.2
2.3 Any TWO:
2.4 Must be set-up that the telescope (1) is placed on a comfortable sightline (1) to prevent a person from bending or stretching over the telescope and tripod (1).
(3)
2.5 Any THREE:
[40]
TOTAL SECTION A: 60
QUESTION 3: SAFETY, MATERIAL AND CONSTRUCTION (SPECIFIC)
3.1 FIGURE 3.1 shows workers who must work in a manhole. Answer the following questions regarding the safety measures which must be applied.
3.1.1 Similar answer:
3.1.2 Similar answer:
3.1.3 When (1) dangerous fumes / gases are (2) present in the manhole / confined spaces. (2)
3.1.4 Respirator (1)
3.2 Similar answer:
3.3 Any TWO:
3.4
3.4.1 True (1)
3.4.2 False (1)
3.4.3 True (1)
3.4.4 True (1)
3.5 Scale or corrosion products (1) are removed (2) by subjecting it as an electrode (3) to an electrical current (4) in an electrolytic bath. (4)
3.6 FIGURE 3.6 on ANSWER SHEET B shows layer 1 of a T-junction in a one-brick wall in stretcher bond. Draw the alternate layer of the T-junction on scale 1 : 10 on ANSWER SHEET B. (7)
3.7 English bond (1)
3.8 Give access to drain system / Cleaning of drain system (1)
3.9 Make a neat section sketch in good ratio to illustrate a manhole construction with benching. Show the following parts and indicate it with labels:
(5) [30]
QUESTION 4: COLD-WATER SUPPLY, HOT-WATER SUPPLY AND EQUIPMENT (SPECIFIC)
4.1 Any THREE properties of water
4.2 Prevents water from leaking from the spindle. (1)
4.3 It reduces splashing / water noise. (1)
4.4 Answer the following questions regarding the valve in FIGURE 4.4.
4.4.1 Non-return valve (1)
4.4.2 B (1)
4.4.3 Open (1)
4.4.4 Where water flows only in one direction. (1)
4.5 Answer the following questions regarding FIGURE 4.4.
4.5.1 S-trap (1)
4.5.2 (1) Keeps water back to (2) prevent odours passing to the inside. (2)
4.5.3 Inspection eye (1)
4.5.4 Cleaning of trap (1)
4.6 Wastewater – water contaminated by human waste / pollutants. Soil water – water from the sink / basin / bath / shower. (2)
4.7 Describe TWO advantages of electronic taps.
4.8 (1) Polluted water harms (2) mechanisms of valves and tap washers. (2)
4.9 4.9.1 Expansion-control vessel (1)
4.9.2 Mixer (1)
4.9.3 Non-return valve (1)
4.9.4 Float valve (1)
4.9.5 Pressure-control valve (1)
4.10 Make neat sketches of the following symbols for hot water systems.
4.10.1 Pressure-reducing valve (2)
4.10.2 Vacuum-relieve valve (2)
4.11 (1) It occurs when a pipe bursts / faulty plumbing (2) traps air in a high point. (3) The air blocks the (4) flow of water. (4)
4.12
4.12.1 True (1)
4.12.2 True (1)
4.12.3 True (1)
4.13 Loose clothing can get caught in the moving parts. (1)
4.14 Name TWO tools which are used for cleaning blockages in drains.
4.15 Water pressure testing pump (1)
[40]
QUESTION 5: DRAINAGE AND QUANTITIES (SPECIFIC)
5.1 Describe the following requirements for an efficient drainage system.
5.1.1 Smooth finishing (1)
5.1.2 100 mm (1)
5.1.3
5.2 (1) Where ground movement occur and (2) leakages must be prevented. (2)
5.3 Name TWO properties of earthenware drainpipes.
5.4 Make a neat section sketch of a coupling socket joint for drainpipes. (3)
5.5 Name TWO positions in a drainage system where gullies must be installed.
5.6 Choose the correct description regarding a septic tank.
5.6.1
5.6.2 Sink to the bottom of the chamber (1)
5.6.3
5.6.4 Sludge (1)
5.7 Give the colour coding for the following drainage fittings:
5.7.1 Brown (1)
5.7.2 Blue (1)
5.7.3 Black (1)
5.8 Identify the following abbreviations for drainage fittings:
5.8.1 IR – Inspection room (1)
5.8.2 ST – Septic tank (1)
5.8.3 CE – Cleaning eye (1)
5.9 Test if drains are airtight / watertight. (1)
5.10 The side of a cubic water supply tank is 1 800 mm. Determine the following of the tank.
(Show all calculations and formulas.)
5.10.1
5.10.2
5.11 FIGURE 5.11 shows the pictorial view of a part of the layout for a drainage system. Answer the following questions regarding the system.
5.11.1
5.11.2 Ø 110 mm (1)
5.11.3 Ø 50 mm (1)
5.11.4 PVC (1)
5.11.5 620 mm (10 mm tolerance) (1)
[40]
QUESTION 6: GRAPHIC COMMUNICATION, ROOF WORK, STORMWATER AND JOINING (SPECIFIC)
6.1 FIGURE 6.1 on ANSWER SHEET C shows the top and front view of a cylindrical pipe. Draw the development of the cylindrical pipe on ANSWER SHEET C. Show all construction lines. (12)
6.2 Indicate if the following statements are TRUE or FALSE. Write only ‘true’ or ‘false’ next to the question number in the ANSWER BOOK.
6.2.1 True (1)
6.2.2 True (1)
6.2.3 False (1)
6.2.4 True (1)
6.3 Join gutters (1)
6.4 Bottom of a downpipe (1)
6.5 Discuss the following regulations which are applicable to stormwater disposal.
6.5.1 (1) It must be drained away from the building (2) to prevent damage to property. (2)
6.5.2 (1) At least 5 m away from any building (2) to prevent any accumulation of dampness. (2)
6.6 Name THREE negative consequences of storm water constructions which do not comply to the requirements.
Any THREE:
6.7 (1) Assists in cleaning the material / prevents oxidation (2) and promotes the flow of solder. (2)
6.8 Resin (1)
6.9
[30]
TOTAL: 200
ANSWER SHEET A
2.1 FIGURE 2.1 shows the floor plan of a storeroom on scale 1 : 50.
Draw the south elevation on scale 1 : 50 on ANSWER SHEET A from the given ground level. (29)
Floor level | 2 | |
Wall | 3 | |
Window | 3 | |
Windowsill | 1 | |
Door | 4 | |
Stairs | 1 | |
Ramp | 1 | |
Fascia board | 2 | |
Gutter | 1 | |
Down pipe | 1 | |
Gable ent | 4 | |
Hipped ent | 3 | |
Roof height | 3 | |
TOTAL: | 29 |
ANSWER SHEET B
3.6 FIGURE 3.6 on ANSWER SHEET B shows layer 1 of a T-junction in a one- brick wall in stretcher bond. Draw the alternate layer of the T-junction on scale
1 : 10 on ANSWER SHEET B. (7)
Brickwork | 6 | |
Application of scale | 1 | |
TOTAL: | 7 |
ANSWER SHEET C
6.1 FIGURE 6.1 on ANSWER SHEET C shows the top and front view of a cylindrical pipe.
Draw the development of the cylindrical pipe on ANSWER SHEET C. Show all construction lines. (12)