CIVIL TECHNOLOGY
GRADE 12
NSC PAST PAPERS AND MEMOS
FEBRUARY/MARCH 2017
REQUIREMENTS:
INSTRUCTIONS AND INFORMATION
QUESTION 1: CONSTRUCTION, SAFETY AND MATERIAL
Start this question on a NEW page.
1.1 FIGURE 1.1 below shows a building site.
FIGURE 1.1
1.1.1 Name the safety equipment shown in FIGURE 1.1. (1)
1.1.2 Explain the purpose of the safety equipment shown in FIGURE 1.1. (1)
1.1.3 Explain under what circumstances it would be necessary to install this safety equipment on a building site. (2)
1.2 Name the type of reinforcing material used to strengthen brickwork. (1)
1.3 Name TWO types of brick bonds used in the building industry. (2)
1.4 Distinguish between a closer brick and a full brick in terms of size. (1)
1.5 Name TWO types of finishing that would be used on a newly plastered kitchen wall. (2)
1.6 Motivate why you used ONE of the finishings that you named in QUESTION 1.5. (1)
1.7 Distinguish, by means of line diagrams, between the profiles of corrugated iron sheeting and IBR sheeting. (2)
1.8 FIGURE 1.8 below illustrates an incomplete sectional view of the substructure of a building.
FIGURE 1.8
Use ANSWER SHEET 1.8 to complete the sketch by drawing the following:
1.9 FIGURE 1.9 shows the incomplete top view of a roof layout showing the roof trusses and the outer walls of a rectangular building. Analyse the illustration and answer the questions that follow.
FIGURE 1.9
1.9.1 Identify parts A, B and C. (3)
1.9.2 Name the type of roof shown in FIGURE 1.9. (1)
1.10 State ONE type of material that DPC may be made of. (1)
1.11 Describe TWO requirements that preservatives should comply with to be used effectively on timber. (2)
[30]
QUESTION 2: ADVANCED CONSTRUCTION AND EQUIPMENT
Start this question on a NEW page.
2.1 Choose a description from COLUMN B that matches an item in COLUMN A. Write only the letter (A–M) next to the question number (2.1.1–2.1.10) in the ANSWER BOOK, for example 2.1.11 N.
COLUMN A | COLUMN B |
2.1.1 Builder's line | A part of a pile (10 x 1) (10) |
2.2 FIGURE 2.2 below shows hand tools that are used on a site and in a workshop. Write down the correct name of each tool next to the letter (A–C) in the ANSWER BOOK.
FIGURE 2.2 (3)
2.3 FIGURE 2.3 below shows a construction of the reinforcement of a beam and a column.
FIGURE 2.3
2.3.1 Name any THREE components used in reinforcement. (3)
2.3.2 What would you use to keep the reinforcement bars away from the formwork when the concrete is being poured? (1)
2.4 Name TWO types of pile foundations. (2)
2.5 FIGURE 2.5 below shows formwork supporting a concrete beam. Analyse the illustration and answer the questions that follow.
FIGURE 2.5
2.5.1 Identify components A, B and C. (3)
2.5.2 Explain TWO functions of component D. (2)
2.5.3 Explain the effect that form oils and emulsions, applied to formwork, will have on the concrete. (1)
2.6 Use ANSWER SHEET 2.6 and make a neat sketch, in good proportion, of a vertical section through the bottom part of a steel-frame dry-wall construction.
Show the following details on your sketch:
2.7 Predict ONE consequence/result if concrete is not adequately cured. (1)
2.8 If any ONE of the ingredients of concrete were left out, what would be the effect/result? (1)
2.9 Draw, in good proportion, a line diagram in the ANSWER BOOK to show the brickwork of a one-brick, semi-circular gauged arch.
2.10 In terms of cost and labour, explain TWO disadvantages of installing an in situ cast concrete suspended floor instead of a rib and block floor. (2)
2.11 Explain ONE reason why you would NOT use a cavity wall as a partition wall inside a building. (1)
[40]
QUESTION 3: CIVIL SERVICES
Start this question on a NEW page.
3.1 Name the fitting that is installed under a wash basin to prevent bad smells from the sewerage system from entering the building. (1)
3.2 Explain the function of the anaerobic bacteria in a septic tank. (1)
3.3 Use ANSWER SHEET 3.3 and draw a line diagram of a septic tank. (7)
Show any THREE labels. (3)
3.4 Define storm water. (2)
3.5 Explain TWO reasons why sewage should not be directed into a storm-water system. (2)
3.6 Explain the purpose of a safety valve, as used in a geyser. (1)
3.7 What will happen if the thermostat inside a geyser does not work properly? (1)
3.8 Distinguish between a high-pressure geyser and a gravity geyser in terms of the incoming water supply. (2)
3.9 Motivate why black paint is used to paint the inside of the tray of a solar panel. (1)
3.10 Draw the symbols for the following:
3.10.1 One-way double-pole switch (2)
3.10.2 Two-way switch (2)
3.10.3 Water meter (2)
3.11 Distinguish between the placement of an elbow and the placement of a tee-coupler/T-fitting, as used in cold-water installation. (2)
3.12 State ONE negative result if a pressure-reducing valve is not installed on the cold-water supply of a building. (1)
[30]
QUESTION 4: QUANTITIES, MATERIALS AND JOINING
Start this question on a NEW page.
4.1 FIGURE 4.1 below shows the front view of a single casement with two window panes. The tenons of all the joints are through and through. The horns on both sides are 25 mm long. Study the drawing and use the information to complete the cutting list. Write down the answer next to the question number (4.1.1 to 4.1.8) in the ANSWER BOOK.
FIGURE 4.1
MEMBER | QUANTITY | 4.1.1 | LENGTH | WIDTH | THICKNESS | MATERIAL |
Frame head | 1 | mm | 4.1.2 | 114 | 75 | Meranti |
Sash top rail | 1 | mm | 580 | 60 | 4.1.3 | Meranti |
Frame stile | 4.1.4 | mm | 1 200 | 114 | 75 | Meranti |
Sash stile | 2 | mm | 1 050 | 4.1.5 | 44 | Meranti |
Glazing bar | 1 | mm | 4.1.6 | 30 | 44 | Meranti |
4.1.7 | 1 | mm | 580 | 60 | 44 | Meranti |
Window sill | 1 | mm | 780 | 4.1.8 | 75 | Meranti |
(8)
4.2 Various options are given as possible answers to the following questions. Choose the answer and write only the letter (A–D) next to the question number (4.2.1–4.2.5) in the ANSWER BOOK, for example 4.2.6 C.
4.2.1 The main difference between coach screws and other screws, such as drywall screws and round-head screws, is the …
4.2.2 … nails should be used to fix skirting to brickwork.
4.2.3 … is used to seal the joint when galvanised fittings are used to join pipes.
4.2.4 When making a soldered joint, the melted solder is drawn into the joint by a … action.
4.2.5 To secure roof trusses to a wall you may use hoop iron or …
4.3 Name ONE place where a heavy-duty expansion anchor (Rawl bolt) may be used. (1)
4.4 FIGURE 4.4 below shows the floor plan of a storeroom.
FIGURE 4.4
SPECIFICATIONS:
Use ANSWER SHEET 4.4 and calculate:
4.4.1 The total outside area of the building that should be plastered from the finished floor level up to the wall plate. Ignore the reveals. (13)
4.4.2 The volume of plaster needed for the external walls. Round off your answers to TWO decimals. (3)
[30]
QUESTION 5: APPLIED MECHANICS
Start this question on a NEW page.
5.1 FIGURE 5.1 below shows a shaped lamina with an isosceles triangular hole. All dimensions are in millimetres.
Study FIGURE 5.1 and answer the questions by writing only the answer next to the question number (5.1.1–5.1.7) in the ANSWER BOOK, for example 5.1.8 2 900 mm².
HINT: Use the formula on the FORMULA SHEET.
FIGURE 5.1
Determine the following:
5.1.1 Area of part 1 (1)
5.1.2 Area of part 2 without the hole (1)
5.1.3 Area of part 3 (1)
5.1.4 Total area of the lamina (1)
5.1.5 Position of the centroid of part 1 from A–A (1)
5.1.6 Position of the centroid of part 3 from A–A (2)
5.1.7 Position of the centroid of part 2 from B–B (1)
5.2 ANSWER SHEET 5.2 shows TWO diagrams of a cantilever frame. Use the answer sheet to answer the questions that follow.
5.2.1 Name DIAGRAMS A and B. Write the answer on the lines provided. (2)
5.2.2 On DIAGRAM A, indicate the nature of the forces in each member by means of arrows. (4)
5.2.3 Complete the table by indicating the nature and magnitude of the forces. (Deduce the information from the drawings given.) (6)
5.3 FIGURE 5.3 below shows the space diagram of a beam with a span of 8 metres with two point loads and a uniformly distributed load. Study the diagram and answer the questions that follow.
FIGURE 5.3
5.3.1 From FIGURE 5.3, deduce the value of the shear forces at A, B, D and E and draw the shear force diagram on ANSWER SHEET 5.3. Indicate the value of the shear forces on the diagram.
Use scale 5 mm = 1 N. (7)
5.3.2 Calculate the bending moment at C. (3)
[30]
QUESTION 6: GRAPHICS AND COMMUNICATION
6.1 FIGURE 6.1 below shows the SITE PLAN of a proposed dwelling. Study the drawing and complete the table on ANSWER SHEET 6.1.
FIGURE 6.1 (15)
6.2 FIGURE 6.2 below shows a line diagram of the floor plan of a two-bedroom house.
Study FIGURE 6.2 and develop and draw, on ANSWER SHEET 6.2, to scale 1 : 50, the FLOOR PLAN of the building. Use the specifications below and on the next page. (Use the assessment criteria on ANSWER SHEET 6.2 as a guideline for your drawing.)
SPECIFICATIONS:
WINDOWS AND DOORS | WIDTH | HEIGHT |
Window 1 (W1) | 1 600 | 1 500 |
Window 2 (W2) | 1 600 | 1 200 |
Window 3 (W3) | 1 600 | 900 |
Door openings 1 (D1) | 900 | 2 100 |
Show the following on the drawing:
Start the drawing from corner A, as indicated in the bottom left-hand corner of ANSWER SHEET 6.2. (25)
[40]
TOTAL: 200
CENTRE NUMBER: |
EXAMINATION NUMBER: |
ANSWER SHEET 1.8
ASSESSMENT CRITERIA | MARK | CANDIDATE'S MARK |
Concrete floor drawn in correct place | 1 | |
Screed drawn in correct place | 1 | |
Symbol for screed | 1 | |
Back filling drawn in correct place | 2 | |
Symbol for back filling | 1 | |
Blinding layer drawn in correct place | 1 | |
Hardcore filling drawn in correct place | 1 | |
Symbol for hardcore filling | 1 | |
DPC drawn in correct place | 1 | |
TOTAL | 10 |
CENTRE NUMBER: |
EXAMINATION NUMBER: |
ANSWER SHEET 2.6
ASSESSMENT CRITERIA | MARK | CANDIDATE'S MARK |
Steel floor track | 1 | |
Nylon anchor | 1 | |
Steel rail | 1 | |
Cladding | 1 | |
Skirting board | 1 | |
ONE label | 1 | |
TOTAL | 6 |
CENTRE NUMBER: |
EXAMINATION NUMBER: |
ANSWER SHEET 3.3
ASSESSMENT CRITERIA | MARK | CANDIDATE'S MARK |
External walls | 1 | |
Inner wall | 1 | |
Opening in inner wall | 1 | |
Concrete base | 1 | |
Inlet and outlet | 2 | |
Cover/Manhole | 1 | |
Any THREE labels | 3 | |
TOTAL | 10 |
CENTRE NUMBER: |
EXAMINATION NUMBER: |
ANSWER SHEET 4.4
Write your answers in the spaces indicated with _________.
4.4.1
A | B | C | D | |
Area to be plastered: | ||||
Total outside length of short walls: | ||||
= 2/ mm | ||||
= mm | ||||
Total outside length of long walls: | ||||
= 2/ mm | ||||
= mm | ||||
Total outside length of all the walls: | ||||
= mm + mm | ||||
= mm | ||||
(3) | ||||
1/ | _______ | Outside area of walls before deductions: | ||
_______ | ______ m2 | (2) | ||
1/ | _______ | Area of window opening: | ||
_______ | ______ m2 | (2) | ||
1/ | _______ | Area of door opening: | ||
_______ | ______ m2 | (2) | ||
Total wall area to be plastered: | ||||
__________ m2 - __________ m2 - __________ m2 | ||||
= _____________ m2 | (4) |
4.4.2
Volume of plaster needed: | ||||
1/ | _______ | |||
_______ | ______ m2 | (3) |
[16]
CENTRE NUMBER: |
EXAMINATION NUMBER: |
ANSWER SHEET 5.2
(4)
DIAGRAM A __________________________ (1)
DIAGRAM B ________________________ (1)
SCALE 1 mm = 1 N
MEMBER | NATURE | MAGNITUDE |
AC | ||
BC | --- | |
CD | ||
DA | --- |
(6)
Tolerance of 1 N to either side
CENTRE NUMBER: |
EXAMINATION NUMBER: |
ANSWER SHEET 5.3
ASSESSMENT CRITERIA | MARKS | CANDIDATE'S MARKS |
Drawing correct | 5 | |
Indicate four or more values of shear forces on drawing | 1 | |
Correct application of scale | 1 | |
TOTAL | 7 |
CENTRE NUMBER: |
EXAMINATION NUMBER: |
ANSWER SHEET 6.1
NO. | QUESTIONS | ANSWERS | MARKS |
1 | Name the scale used for the site plan. | 1 | |
2 | Name the colour that you would use to shade the proposed dwelling on a site plan. | 1 | |
3 | Identify number 1. | 1 | |
4 | What is the number of the plot on which the house will be built? | 1 | |
5 | Describe abbreviation 3. | 1 | |
6 | Determine the distance from the boundary line to the proposed dwelling on the western side of the building. | 1 | |
7 | Determine the distance between the building line and the building on the northern side of the building. | 1 | |
8 | In which street is the entrance to the site located? | 1 | |
9 | Draw the roof line of a gable roof for the building indicated in the column alongside. | 3 | |
10 | Calculate the total area of the building in square metres. | 2 | |
11 | If the area of the site is 750 m², what percentage will the building occupy on the site: 29,2% OR 27,2% OR 25,2%? | 2 | |
TOTAL | 15 |
CENTRE NUMBER: |
EXAMINATION NUMBER: |
ANSWER SHEET 6.2
ASSESSMENT CRITERIA | MARKS | LM | ASSESSMENT CRITERIA | MARKS | LM |
External walls | 4 | Bath | 1 | ||
Internal walls | 5 | Dimensions | 2 | ||
Windows | 4 | Application of scale | 3 | ||
Doors | 4 | ||||
Wash tub | 1 | ||||
Water closet | 1 | ||||
TOTAL | 25 |
FORMULA SHEET
IMPORTANT ABBREVIATIONS
SYMBOL | DESCRIPTION | SYMBOL | DESCRIPTION | SYMBOL | DESCRIPTION |
c | Centroid | b | Breadth/Width | r | Radius |
ℓ | Length | s | Side | A | Area |
FORMULAE
AREA OF | FORMULA (in words) | FORMULA (in symbols) | FORMULA FOR THE POSITION OF CENTROIDS | |
X-axis | Y-axis | |||
Square | side × side | s × s | s/2 | s/2 |
Rectangle | length × breadth | ℓ × b | ℓ /2 | b/2 |
Right-angled triangle | ½ x base × height | ½b × h | b/3 | h/3 |
Equilateral triangle/ Isosceles triangle | ½ x base × height | ½b × h | b/2 | h/3 |
Position of centroid = (A1×d) ± (A2 ×d)
Total area
OR
Y = ∑Ay
∑A
OR
X = ∑Ax
∑A